Introductionof Suspended Platform
With the characteristics of high strength and lightweight, rope suspended platform is widely used in the installation of curtain walls and windows, window cleaning, external renovation and decoration of buildings, bridges, chimneys, silos, and other structures, etc. Compared with the traditional scaffold, the suspended platform adopts electric drive power, which has higher efficiency and lower cost.
Important Components of a Suspended Platform
A suspended working platform includes a winch, climber, chain block, hoisting block, pulley block or gin wheel used for raising or lowering.
The wire rope carrying the weight of the working platform and the imposed load thereon. Toe board A board set on edge used to prevent tools, materials or a person’s feet from slipping off the working platform. Trolley track The rail or rails normally installed at roof level which support and guide the roof trolley in its working positions. Winch A lifting appliance operated to raise and lower the working platform by means of a suspension rope reeled on to a drum.
A brake, automatically applied, which stops the hoist and holds the working load under normal operating conditions, when power to the prime mover is interrupted or discontinued.
A device or devices acting on a safety rope which will arrest and sustain a working platform in the event of the failure of a suspension rope, the winch, the climber or any part of the mechanism for raising or lowering the working platform.
A safe system of work should be established for every operation of a suspended working platform by the owner. The system should be prepared and endorsed by the owner, with the advice of project engineers, safety professionals, and relevant personnel of the site or of the building management. It should be distributed to all personnel involved in the operation. The safe system of work should be monitored and supervised by a competent person.
ZLP Seris Suspended Platform Parameters
Suspended platform is driven by electric hoist and wire rope, running against the building facade while the suspension mechanism was erected on buildings or structures.
Model | ZLP630 | ZLP800 | |
Suspended Platform | Rated Load | 630KG | 800KG |
Rated Lifting Speed | 9.3±0.5m/min | 8.2±0.5m/min | |
Length of Platform | 6000mm | 7500mm | |
Surface Proceeding | Aluminum;steel materials(Galvanized,Spraying) | ||
Lifting Height | 100m | 100m | |
Cable | 100m | 100m | |
Max Lifting Height | 200m | 200m | |
Steel Rope | 8.3mm | 9.1mm | |
Hoist | Power | 1.5KW*2 | 1.8KW*2 |
Voltage | 380V, 50HZ, Three-Phase(standard) | ||
Safety Lock | Permission Force of Impact | 30KN | 30KN |
Locking Cable Angle | 3°~ 8° | 3°~ 8° | |
Suspension Mechanism | Front Beam Overhang | 1.3 ~ 1.5m ±0.26 | 1.3 ~ 1.5m ±0.26 |
Support Adjustable Height | 1.44 ~ 2.14m ±0.26 | 1.44 ~ 2.14m ±0.26 | |
Counter Weight | 1000KG | 1000KG | |
20' GP Container | 9sets | 8sets | |
40' GP Container | 12sets | 12sets | |
40'HQ Container | 27sets(without couter weight) |
Our Advantages
① 24-hours online consultation service is available here. Once you have any questions, just contact us and our professional staff will reply very quickly.
② Market information also will be provided. Since we are an experienced supplier of hoist parts, the market information about hoist and hoist parts will be offered as long as you contact us and ask for it.
FAQ
Q: Are you a trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What are your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment.